Most processes are designed in a conference room by people who are optimistic about human behavior. They assume that everyone will follow the steps, that the documentation will be read, and that the process will be used consistently because it is clearly the right approach. These assumptions are wrong in almost every case.
Processes do not die because they are bad ideas. They die because they were designed for ideal conditions and deployed into real ones.
The Four Reasons Processes Die
First, the process is too complicated. If following the process requires more steps than the team can hold in their head, the team will simplify it informally. Their version will not match your version, and the inconsistency compounds.
Second, the process has no owner. A process without a named owner has no one responsible for noticing when it drifts. And all processes drift. Without someone watching for drift, a process that worked in month one looks nothing like itself by month three.
Third, the process was never tested before it was deployed. It was designed, documented, and launched. The first version of any process will be wrong in ways you cannot anticipate until someone actually tries to follow it under real conditions.
Fourth, there is no feedback mechanism. The people closest to the process see its problems most clearly, but there is no channel for that information to reach the people who can change the process. Problems accumulate silently until they become crises.
How to Build a Process That Survives
Design for the minimum viable version first. What is the fewest number of steps required to achieve the outcome consistently? Start there. Complexity can be added later if it turns out to be necessary. It usually is not.
Assign a specific owner before the process goes live. This person's job is not to do the process. Their job is to monitor whether the process is being followed and to surface problems before they compound.
Run a test with one person before full deployment. Give them the documentation and no other guidance. Watch where they get confused. That confusion is where the process will fail at scale.
Build a ninety-day review into the launch calendar. Not a check-in. A formal review where the owner reports on what is working, what is not, and what changes are needed.
The process that survives 90 days is not the most sophisticated one. It is the one that was designed to be improved. Reply with "systems" and I will send you the process design template I use to build operational procedures that last.

